• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name LeRose

    Log entry time 13:14:27 on January18,2001

    Entry number 55005

    Followups:

    keyword=Energy Measurement Aborted

    ARC energy measurement failed because we had problems turning on the HV to the PMT's. Standard proceedures did not work (could have been operator error).
    Decided to postpone measurement so the problem could be solved without wasting beamtime.