Vince told us what the problem was and how to fix it:
The problem was that the positions of the targets on the lifter ladder had changed. However, the switches that interlock to the FSD had not been moved to the new positions. There is a blue switch for each position "Ref Cell," "Empty Target," "BeO+C," & "Pol He Cell."
To temporarily solve the problem, we moved the switch corresponding to "Empty Target" down until the FSD reading at MCC was correct. We also moved the switch corresponding to "BeO/C" down and out of the way. Note that only the "Empty Target" switch is in the correct position.
We are now ready to accept beam with the target in the "Empty Target" position.