Main INDEX
Monthly INDEX
PREV
NEXT
User name Markowitz
Log entry time 11:12:01 on June 20, 2005
Entry number 146687
This entry is a followup to: 146531
Followups:
keyword=A1 pmt replaced
Armando and I went in and replaced a PMT on A1 corresponding to channel
10 of the histograms. [Sunday owl had shown that the tube/base combo was
dead but at the time we did not a pmt ready to replace it with.]
The signal looks good from this tube, but it does need to be hardware and
software gain matched. Armando took the old tube from the hall and will
check whether the culprit is the tube or base.
A copy of this log entry has been emailed to: mandrox@jlab.org, bogdanw@jlab.org