Main INDEX
Monthly INDEX
PREV
NEXT
User name sawatzky
Log entry time 12:38:05 on October 27, 2005
Entry number 158159
This entry is a followup to: 158158
Followups:
keyword=Bleedthrough measurement will be done next time B laser spontaneously loses lock
The bleedthrough measurement is in the PD's shift plan and will be done
opportunistically then next time B laser spontaneously loses lock.
MCC doesn't want to intentionally break the lock right now in case they
can't get it back.