    User name sawatzky

    Log entry time 12:38:05 on October 27, 2005

    Entry number 158159

    This entry is a followup to: 158158

    Followups:

    keyword=Bleedthrough measurement will be done next time B laser spontaneously loses lock

    The bleedthrough measurement is in the PD's shift plan and will be done opportunistically then next time B laser spontaneously loses lock.

    MCC doesn't want to intentionally break the lock right now in case they can't get it back.