• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name sawatzky

    Log entry time 14:44:24 on October 27, 2005

    Entry number 158160

    This entry is a followup to: 158159

    keyword=Bleedthrough test plan

    A bleedthrough test plan has been written by Marcy (injector group) to reproduce the worst-case B-laser slit, attenuator, etc. conditions of last night.

    The test plan is pretty short (10-15 minutes) and will be run the next time the B-laser spontaneously loses lock. If that doesn't happen in the next few days it will be done invasively.

    Marcy reports that the polarization of Hall B was (synchronized with and) opposite to that of Hall A at that time. Their polarization should have had the same magnitude, opposite sign of ours.

    A copy of this log entry has been emailed to: paschke@jlab.org, rom@jlab.org