    User name Target

    Log entry time 13:42:33 on December 23, 2008

    Entry number 254466

    Followups:

    keyword=He-3 cell removed / Water cell installed

    We removed the He-3 cell and have it surveyed by the RADCON. Water cell is already installed and now adjustment of the pick up coils is being done as a part of the preparation for our water calibration. In the process of removing the reference cell at the beginning , we broke the cell at the tip.