NEXT
Make New Entry,
Make Followup Entry
User name Ramesh/Xiaochao
Log entry time 09:48:35 on May 12, 2009
Entry number 272672
This entry is a followup to: 272631
Followups:
keyword=access activity (PVDIS work)
Items checked today:
1. Checked the signal cable lengths for shower and preshower cables. All
of them are 60 ns long.
2. Checked the working of PVDIS veto, found nothing wrong.