• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT
    Make New Entry, Make Followup Entry

    User name Ramesh/Xiaochao

    Log entry time 09:48:35 on May 12, 2009

    Entry number 272672

    This entry is a followup to: 272631

    Followups:

    keyword=access activity (PVDIS work)

    Items checked today:

    1. Checked the signal cable lengths for shower and preshower cables. All of them are 60 ns long.

    2. Checked the working of PVDIS veto, found nothing wrong.