NEXT
Make New Entry,
Make Followup Entry
User name R. Subedi
Log entry time 12:03:34 on May 14, 2009
Entry number 273292
This entry is a followup to: 272672
Followups:
keyword=access activity (PVDIS work)
1. Removed 16 ns cables from gr1 to gr4 in the shower branch in SUM8 to
linear sum P/S 740 section.
2. Removed 32 ns from gr3 in the preshower branch in SUM8 to linear sum
P/S 740 section.
3. Made the timing of T1 gas cerenkov in the PVDIS setup such that
gas-cerenkov signal is about 3 ns earlier than T1. This has nothing to do
with the host experiment T1.