• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT
    Make New Entry, Make Followup Entry

    User name R. Subedi

    Log entry time 12:03:34 on May 14, 2009

    Entry number 273292

    This entry is a followup to: 272672

    Followups:

    keyword=access activity (PVDIS work)

    1. Removed 16 ns cables from gr1 to gr4 in the shower branch in SUM8 to linear sum P/S 740 section.

    2. Removed 32 ns from gr3 in the preshower branch in SUM8 to linear sum P/S 740 section.

    3. Made the timing of T1 gas cerenkov in the PVDIS setup such that gas-cerenkov signal is about 3 ns earlier than T1. This has nothing to do with the host experiment T1.