1. Production runs 2699/21603 are stopped early for the spin flip
2. Target Field Correction Coil is turned off
3. The field was rotated to Transverse- (45-Degree-Step) and the Q-wave plates were set to "spin down" direction to pump the 3He spin to Transverse+ which is anti-parallel to the field direction.
4. Last Trans+ EPR Calibration constant (Halog 274918, 1.79%/mV) is loaded
5. Do NMR, Pol. = 54.3%. Confirm of sign change
Special Note: The spin signal to DAQ is still kept as "Spin down"; so
working gated scalar pairs are not changed
A copy of this log entry has been emailed to: yqiang, rsubedi
Field Rotation
Motor1338 Setting
NMR After Rotation