    Log entry time 19:26:35 on October 31, 2009

    Entry number 297054

    This entry is a followup to: 297052

    keyword=Re: RHRS BPM4A/B looks file

    The only important change that we made was there were cable T's that I
    believe were left over from the d2n run period. We had teed off the BPM
    and raster signals to send a copy to the BigBite weldment. I found this
    morning that the cables had been disconnected, but the T's were left
    unterminated. Rupesh and I removed the cable T's and restored the system
    as it was in the pre-BigBite era. It's possible the connection going to
    the R-HRS had a problem and we fixed it when we removed the T's.