Main INDEX
Monthly INDEX
PREV
NEXT
Make New Entry,
Make Followup Entry
User name V. Sulkosky
Log entry time 19:26:35 on October 31, 2009
Entry number 297054
This entry is a followup to: 297052
keyword=Re: RHRS BPM4A/B looks file
The only important change that we made was there were cable T's that I
believe were left over from the d2n run period. We had teed off the BPM
and raster signals to send a copy to the BigBite weldment. I found this
morning that the cables had been disconnected, but the T's were left
unterminated. Rupesh and I removed the cable T's and restored the system
as it was in the pre-BigBite era. It's possible the connection going to
the R-HRS had a problem and we fixed it when we removed the T's.