Log entry time 10:42:15 on November 25, 2009
Entry number 302497
This entry is a followup to: 302330
keyword=Run coordinator daily summary
Run Coordinator's Report for Tuesday November 24 Day to Wednesday
November 25 Owl
Summary
- 5 Owl shifts in the next week need a shift leader.
Please sign up!
- No data production data was taken until Owl in this period. We made
an access to come out of the positive polarity running on Tuesday morning
during which accelerator personel worked on the Compton ion chamber which
was tripping without beam in the hall. There was an access in the North
Linac at 11 am followed by the cathode spot move in the injector. Then a
shunt power supply far an arc magnet failed. We finally took beam at 8
pm. A Moller poalrisation measurement was performed yielding
87.0 +- 2.0 %. Production data was taken overnight. We completed
slug 7 and began slug 8.
Run Plan
- High current production running throughtout weekend.
Requests
- 5 Owl shifts in the next week need a shift leader. Please
sign up!
- Shift Leaders: please write a detailed shift summary (including
runs taken and any
activities) and submit the BTA for each shift. Please log CODA reboots
in the halog and shift summary.
- 3rd person: Please make sure to start and stop the HRS DAQ
at the same time as the parity DAQ and to do the prompt analysis and the
HRS analyzer for every run.
- 3rd person: please keep a careful eye on the online data display.
Most problems can be caught quickly this way.
- Please make sure that the shift checklist is done once each shift.
Data taken
- Production charge taken in the 24 hours ending Tuesday Owl: 1.3 C
- Total production charge taken in all, end of Tuesday Owl: 30.1 C
(removed positive polarity data from count)
Shift Summaries and BTA Reports
Figure 1