Main INDEX
Monthly INDEX
PREV
NEXT
Make New Entry,
Make Followup Entry
User name jroche
Log entry time 15:32:13 on November 28, 2010
Entry number 341812
This entry is a followup to: 341808
keyword=The enegry feedback is now back on the Hall C beamline
After a quarter of an hour or so with the nergy feedback on the Hall A
line, this system was set back to lock to the Hall C line: our COmpton
rates were reallybad and the beam was tripping a lot along the Hall C
line (though the BLM).