Once beam is back, proceed with the beam recovery procedure.
Once the right dipole has completed cycling, Larry will do a deadtime curve to try to see if the new configuration will work (several runs in quick succession).
We'll need to adjust the prescales to get the rates that are on the whiteboard, in conjunction with trying to increase the current (keeping the DT below 15%).
Take production data (4cm LH2 target) on the kinematic setting #2.
Sometime before changing settings (likely not until the morning), take a 1 hr long Al target run (w/ raster on) and a 5 min BeO run (more details to come).