• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT
    Make New Entry, Make Followup Entry

    User name jmammei

    Log entry time 16:26:11 on March 01, 2011

    Entry number 349417

    This entry is a followup to: 349412

    keyword=settings for Al and Be0 runs

    The Al runs should be taken with the same prescale settings as the production runs, at 20uA, with the raster on. Take 1 hour long runs.

    Same for the BeO run, except it only needs to be 5 minutes.

    Take these two runs sometime in the middle of the production running (don't wait until the very end).