    User name brads

    Log entry time 11:28:06 on March 16, 2012

    Entry number 366680

    This entry is a followup to: 366582

    keyword=GEp/G2p status update and Run Plan sketch -- Friday

    After some waiting associated with accelerator problems and a slow steer-up into Hall B, we successfully got beam into our Hall around 4:30am. The raster settings were verified for production running and the beam was centered on the Target (this required some minor adjustments to the target ladder set points): Halog 366650. Once the steer-up and centering was complete we asked for beam off to run a TE before polarizing. MCC has had cryo issues in the accelerator (1L02 region) starting shortly after that. We have since completed the TE and polarized the target and are now waiting for MCC to beam fix the cryo issue and restore beam.

    When beam returns we will start with a BCM calorimeter run (at 50nA), take some dilution study data, and then move into full production. DAQ experts will use the BCM calibration time to double-check some questions regarding the HRS triggers prior to production running.

    1. BCM calorimeter run (Alex/Pengia)
    2. Carbon, empty target dilution runs
    3. G2p production
    4. BPM/Harp runs (Alex/Pengia) -- this needs to happen, but
    A detailed production runplan (as of this time) is attached to this Halog (see p. 2). The most up-to-date version of the runplan can be found here (PDF file).

    Shift crew need to pay close attention to the following:



    A copy of this log entry has been emailed to: brads,g2p



    Run plan details as of this morning (pdf)

    runplan-16Mar2012.pdf