27 Feb 2008 Meeting Summary
Back to CSR Weekly Meeting on 2008
Xinhu
-leakage -problem with Y need to check position -need more statistics
-geometry of detector -angle for rotation of detector
-gather beamline informations from Vince
calibration of NaI and check
Yoomin plots
still variation of rate on C with current by 3%
-need to check deadtime -need to check charge
charge is computed as average of u1,d1,u3,d3 double check with x1 and x3 BCM separately
check number of multitracks
question : effect of start of run
ifarml3 database access
Huan -survey
recomputed foil position
sieve slit survey was done february number similar to before ( offset in vertical different )
- optics run
-after optimization : small changes
only 4 matrix elements for theta
add additionnal elements
Failing of optimization : optimize lower order firsts then turn on further orders
time consuming part with graphical cuts
JP Target measurement from UMass : can lend all setup need replace missing part : detector and source
Vince :
meeting for harp