April 16th 2021
From Hall A Wiki
- Updates
- HCal
- New FADC working, taking cosmics
- F1 switch to external clock in top crate with help of Mark and Bryan
- Got cables from Mindy, will be installed
- VME DAQ almost complete, needed a few additionnal parts
- HCal
( next week or week after )
- will install discriminator with remote threshold
- one channel need one lemo replaced
- plan for moving HCAL racks May 10th, racks can be moved individually - decabling
- DAQ location : one month down to get power and other utilities
- will try to get computer and racks up
- BB Shower
- Trigger monitor and FADC fully cabled
- Mark looking into readout
- will take data until Jessee gives heads up for move ( 1 week before move ) , will uncable and detector and move in hall
- will start setting up cable on trays
- Jack did measurement of BB weldment, will check if it can get inside bunker
- looking at individual channels for noise level, still issue of noise on one side after HV switch. Looked on scope and could not see difference left and right.
- F1 trigger from TI : but F1 seems to not get it from trigger ( Data not ready error ) - going to NIM/ECL translator - pretty big delay ( ~ 700 ns for FADC and 1200 ns for TDC) - using TDC output - can use the prompt output OT#2 instead -
- BB Hodo
- taking data multiple run every day
- gain matching on going
- will add time threshold studies
- GRINCH
- took good cosmics run with large paddle
- checked VETROC decoding was working, will test with ADC
- Gasket material received and will be cut next week
- scintillator paddle moved back to original position
- LHRS
- Maria working on detector cabling
- setting up VXS in room 1546 for helicity with Paul
- Centos 7 upgrade with help of Ole : ready for SBS cpu now
- restored FADC DAQ, issue with fastbus ( all 0 in data from time to time : known bug ) - FB arbitration time out
- CDet
- still taking cosmics data
- sbs2 working fine
- still need put VETROC in crate
- GEM TEDF/INFN
- INFN GEM in test lab working
- INFN TEDF looking at modified MPD, made things worse, maybe due to only have half of chamber powered
- VXS for VTP readout - need IP - need get APV backplane for starting testing
- GEM UVA
- finished assembly 4 GEM layers, replaced with all good backplanes ready to move in GEn RP inline
- noise study : help with Bogdan, test to find noise, grounding scheme to be tried
- BB FADC has couple of empty channels
- Scott giving HCAL talk on Sunday g21 - instrumentation
and poster session Sunday afternoon 2PM