April 1st 2022

From Hall A Wiki
Jump to: navigation, search
  • Updates
    • HCAL
      • Ethernet cables for VTP, 5 cables
    • Hodoscope
      • working on calibration work : TDC alignement
    • CDet
      • installation optimized resistor : half of detector
    • Beamline
      • Circular raster set up, need to look at raster uniformity : need to run DAQ at high rate, same as GEM pedestals
    • HV
      • Bob working on Rpi, Bob can produce SD boot card
      • test HV on LHRS and plan have spare card
  • Need to give back Hall C FADCs
  • GEM :
    • CAEN HV setup
  • RF time setup
    • issue
    • GMn need missing momentum, hodoscope
  • APV pulser setup for testing
    • check with electronics