April 1st 2022
From Hall A Wiki
- Updates
- HCAL
- Ethernet cables for VTP, 5 cables
- Hodoscope
- working on calibration work : TDC alignement
- CDet
- installation optimized resistor : half of detector
- Beamline
- Circular raster set up, need to look at raster uniformity : need to run DAQ at high rate, same as GEM pedestals
- HV
- Bob working on Rpi, Bob can produce SD boot card
- test HV on LHRS and plan have spare card
- HCAL
- Need to give back Hall C FADCs
- GEM :
- CAEN HV setup
- RF time setup
- issue
- GMn need missing momentum, hodoscope
- APV pulser setup for testing
- check with electronics