- Updates
- HCAL
- still working of F1 with external clock
- still need 1 FADC, will check FADC
- patch panel for DAC, design done - will design GUI to control thresholds
- 60 cables for overlapping sum , 40 out of 60 done by Mindy
- Bigbite shower
- Bigbite weldment not moved, will move crates instead of weldment
- two more students joining
- trigger monitor fully cabled , ready to be looked at
- FADC side cabling done, cabling front end to BNC patch panel - will take FADC data
- Bigbite hodoscope
- taking data
- new trigger setup
- gain matching on-going
- plan for move in hall
- GRINCH
- tested LED, seems working
- taking cosmics data with large scintillator and small scintillator - taking a run right now
- need ADC
- LHRS
- LHRS detector installed
- working on Centos 7 upgrade
- GEM TEDF
- found all issues , can run INFN GEM, 2 MPDs taken to electronics to add resistor to reduce pedestal shift
- ready for SSP firmware update
- GEM UVA
- noone
- CDet
- taking cosmics
- APS meeting poster by undergrad on CDEt during poster symposium by Taylor Edwards
- HCAL