August 13th 2021
From Hall A Wiki
- Updates
- HCal
- HCal fully cabled
- starting reestablishing DAQ, can log to ROC
- will work today on HV (rpi20 and 21)
- and try to take data
- summing trigger should be working, need to adjust for delays with different PMTs
- Bigbite Shower
- Eric, Provokar
- need plug in 15 more bundles
- need plug scalers ( NIM/ECL converter to scaler and F1 TDC)
- set up cosmics
- need cable for BigBite shower thresholds
- will finish cabling this week, start turning on next week
- check mapping
- Bryan configuring all detectors today - think to finish today
- Bigbite Hodoscope
- all ADC and TDC cabled at detector frame and signal going to bunker, all cables reach in bunker - TDC cables a bit short to reach converter -
- connecting ADC, TDC, HV and LV left
- software progress by Rachel
- ADC cables 100 m
- need to setup gate for ADC
- GRINCH
- existing cabling was redone at Bogdan's request - slack near BB was moved in near main bunker
- half fully cable
- other
- TDC will be redone
- HV cables laid and are connected
- rpi17 HV
- share same LV cable
- software ok, still need online monitoring
- still need to move to a-onl account
- scalers display ? Existing and will be installed
- LHRS
- Maria learning PID for LHRS software
- Bob helping Ole in counting room ( should be ready in 2 weeks )
- still connect to connect to TS - should receive the part fiber next week and can try
- pulser to simulation coincidence
- EDTM ? Need to look for it
- CDet
- taking data to optimize resistors
- after look different HV for efficiency
- helping in Hall for installation
- CNU starting again next week
- GEM BB Hall A
- 23 MPDs in Hall
- all up to date for firmware
- can update firmware in test lab
- 10:30 AM power outage, because UV layers, LV was plug on same socket and tripped. Nothing can be read out yet. Being investigated, Thir bringing spares
- need trigger fan/out box for rest of MPDs
- HCal
- GEM INFN Test Lab
- HV test on two SBS layers, HV tripping is due to shielding - putting shielding in pieces to see where it can short -
- SSP crate to update firmware for MPDs
- GEM INFN Test Lab
- RF time
- HV
- MPOD HV GUI for the GEM people
- HV for shower and GRINCH up
- will check hcal
- HV
- Scalers
- Also I got the DSC modules to work as scalers and I am setting up a bunch of SIS scalers as 3800s. I also have 4 G0 scalers that we could use, but we should make sure that they have wide input signals (>10 ns) and that we don’t use them for anything critical like deadtime, efficiency, beam current etc.
- Bigbite scalers to be added to this crate
- Recoil polarimeter
- hodoscope plugged
- DAQ rack for experiment set up
- starting using Hall A system to boot CPU
- Scalers
- EPICS
- David found alh not available ( used on old computer - hacweb7 ) will move to adaqsc -
- EPICS
- Helicity
- scalers installed, Paul back from vacation
- Helicity
routine pick -up scaler event for the helicity seed and will be inserted in data stream
- helicity signal in counting room - not reaching HRS -need to check cable and trace
- same data stream in SBS scaler crate : need libraries on sbsvme29, library for 3801 - could be easier if in different crate - will check to put it in TS crate or hodo crate
- reported helicity and T settle signal tagged in trigger
- taking the RHRS signal to SBS weldement
- start / stop / EPICS script
- Bob has templates working with CODA3
- start / stop / EPICS script
- On-going tasks
- Network setup ( done ) - SBS MPD side might need few cables - need pull network for SBS side (0%)
- Scaler crate setup (70 % - Steve ) - Steve could not talk to CPU - IP fixed with DHCP - need change fan tray - CAEN
- documentation of VME crate names to power cycle - need to make sure all VXS are in dhcp -Bryan
- 3 rd GEM VXS crate install router moved up ( 100% )
- need power and network in GEM bunker ( done )
- boot VME controllers (100 % done - need ask hostname TS crate )
- TS cables - all fibers plugged - will post informations -hodoscope / grinch/ shower separate - can be combined at any time now everything plugged to TS
- detector cabling
- new MPD production - about to start - FPGA shipped to Paolo -
- MPD VTP readout - on-going in daq lab - still having issue getting APV sending data to MPD - events going through high speed link
- MPD being setup in Hall A - need setup VTPs to boot (done ) - 10 gigE network plugged (done) - will be able to test in Hall A - LV installed soon (done )
- setup portservers : 1 4 port portserver for VTP (done), still need to set up a 8 port one and HCAL portserver
- need to install remote switch for crate in bunker - rest are VXS or VME64 -
- Bigbite - HCal trigger setup - need check with Bob if additionnal NIM crate need to be install
- TS setup - 50 %
- Beamline crate setup ( in scaler crate ) - FADC is in scaler need to be setup - need pull raster BPM BCM (0% will do it with David )
- HCAL cabling
- HCAL need power ( done, Berta )
- Mark hodoscope trigger ?
- Computer move to Hall A : sbsdaq1/2/3 tedbbdaq (done ) enpcamsonne ( done ) - need to install X server - Need ask Ole -
- LHRS fiber pull ( waiting fiber August 13th ) - most likely LHRS at end of SBS run
- Cosmics trigger ( Bogdan ? 0 %) -
- Cosmics HCAL
- Cosmics Shower
- Cosmics Hodoscope
- Test 10 gig link to DAQ to adaq1
- EPICS script -
- alarm handler (David)
- Outstanding issues
- 2 bad FADCs Bigbite - 1 FADC was repaired - one being repaired - 1 Compton FADC - repaired can use as spare ( done )
- SD delay : still need 2 SDs ( Glasgow and INFN just requested quote )
- need to adjust for HCAL transit time with different PMTs
- status of cosmics paddles ( installed by Bogdan )
- GEM fibers too short : Mark will order parts - need to check status of order
- 15 bad MPDs - need to look at fixing - Ben ? Dustin loaning us 6 MPDs - need 85 total - 67 in hand - 1 MPD (301) VME address issue in some slot -
- APV needed 1208 - 966 in hand working - Michael might lend 40 - ( check with Thir )
- GEM fiber possibly bad - 2 broken - if long sleeve want to pull spare in separate conduit
- GEM HV IP need setup ( Alex ) Done
- GEM clock/trigger box for BB side