December 20th 2024

From Hall A Wiki
Jump to: navigation, search
  • Updates
    • Cdet
      • All done with TDC ribbon cable this week
      • LV still on going -
      • working on software
      • cosmics maybe 1 or 2 weeks next year
      • all retroffiting done and installed
    • HCal
      • changed two PMTs - no more spare bases for one type - installed another one with base - can get signal when increasing HV ( 8 stages PMTs )
      • Alex worked on standalone, almost done but issue with database -
      • might switch VME readout for cosmics so can be added with all detectors
      • cosmics trigger in ROC16 - In TS cosmics digital and analog
    • Beamline
      • All beamline crate reconnected
      • helicity
      • BCM cabling rearranged for scaler and helicity scaler
      • helicity scalers and helicity decoding module installed and connected, working
      • working on rol to include helicity decoding board - ready to test by early January - want to test LHRS and beamline
      • not setup for xscaler and cable from NIM crates to be cabled - Bob and Jiwan will look on xscalers -
      • want L1A for helicity scaler
    • Ecal
      • CODA config with all ECal crates
      • Ben might be done with cosmics
      • people still finishing cabling
      • might still be a few channels and FADC to be fixed
    • GEMs
      • all HDMIs cable plugged
      • 3 out 4 VTPs tested : clock phase issues on the 3 will be fixed - 2 MPDs might have issue with digital
      • no cosmics planned
      • 5th VTP crate up for histogramming test - I need 10gigE to finish setup
      • Anu showed simulation - need to translate hits