December 6th 2024

From Hall A Wiki
Jump to: navigation, search
  • Updates
    • Ecal
      • VTP firmware ready, working on SSP firmware ( 2 days )
      • need CODA config with VTP : Alex will make one and add SSP initialization
    • Cdet
      • 1or 2 weeks away for data cosmics - could take cosmics for 1 module - installing last set of cables from bunker to - need to make the last nugent cables - All detectors from Nino to - 1 module left for retroffiting
      • LV need if work : infrastructure cables and test operating all modules
      • HV good to go
      • Ben Spaude WM student will work on the schematics with Jacob Byrd , will use for detector manual
      • Laurence / Robin : frame for detector should be ready next week
      • sbs-online analysis database : Ben will work on that
      • network cable for supplies ? new LV max out at 5.2 V so switching back to older supplies - need 6.4 V to get 5 V at Nino - need to check if need to go on remote power switch
      • Trigger : need to setup cosmics trigger
    • GEM
      • still waiting for when GEM will be able to be moved
      • can start cabling fibers in bunker ?
      • working on replacing APVs : front tracker done, need data from back tracker
      • VTP to be setup in top crate for histogramming and ROI readout testing next week
      • INFN clean room setup ? seems working main issue was MPD with same address as SSP. VTP is booted but need to be setup
    • beamline
      • visit possibly next Thursday
      • get helicity decoder board into the crate
      • Cip and one more person to help reconnecting the crate
    • ECal : switch to gep5 filename
    • CODA update : still debugging - will set up GEM to run indepently until new version released