February 19th 2024
From Hall A Wiki
- Updates
- Active polarimeter
- get cables
- setup cosmics triggers
- Wednesday cable the detectors
- HCAL
- Jiwan gave the files to Ben
- first release of firmware with trigger and VTP readoout - can deploy this week
- Hodoscope
- meet to check detector and check with cosmics run
- need to take cosmics
- need ePAS for hodoscope , will check with Arun
- CDEt
- working on last module, soldering resistors and take more cosmics.
- work in Hall : waiting for Peter to have ePAS training, can start running cables in Hall
- HV computer still not online : waiting for hostname change
- give connector to make adapter to VETROC
- TDC cable in ESB will be moved to CNU to put connectors
- discussion of location of low voltage ( in bunker behind ECal or somewhere else )
- Active polarimeter