February 19th 2024

From Hall A Wiki
Jump to: navigation, search
  • Updates
    • Active polarimeter
      • get cables
      • setup cosmics triggers
      • Wednesday cable the detectors
    • HCAL
      • Jiwan gave the files to Ben
      • first release of firmware with trigger and VTP readoout - can deploy this week
    • Hodoscope
      • meet to check detector and check with cosmics run
      • need to take cosmics
      • need ePAS for hodoscope , will check with Arun
    • CDEt
      • working on last module, soldering resistors and take more cosmics.
      • work in Hall : waiting for Peter to have ePAS training, can start running cables in Hall
      • HV computer still not online : waiting for hostname change
      • give connector to make adapter to VETROC
      • TDC cable in ESB will be moved to CNU to put connectors
      • discussion of location of low voltage ( in bunker behind ECal or somewhere else )