Previously...

  • BCM calibration ( YES !!)



Specific mission

  • Note:

1/ Back to production mode

- 15uA through Compton chicane
- LH2 target
- DVCS ON
- LHRS=2.92GeV, Q1/Q2/Q3=1916.640(readout:1900)/1600/1600 (Q1 regul.OFF)
- PreScaleR : PS1=PS2=PS3=1, && PS8=200
- PreScaleL : PS9 =1, + DVCS config.



Weekend Plan

  • Note:

1/ continue production data



BPM/Spot++ Check

  • After beam lost for considerable time (like beam study, pass change,...)