Friday, Mar. 04: SWING Shift
From Hall A Wiki
Go back to Daily Run Plan Daily Run Plans
Previously...
- BCM calibration ( YES !!)
Specific mission
- Note:
1/ Back to production mode
- 15uA through Compton chicane
- LH2 target
- DVCS ON
- LHRS=2.92GeV, Q1/Q2/Q3=1916.640(readout:1900)/1600/1600 (Q1 regul.OFF)
- PreScaleR : PS1=PS2=PS3=1, && PS8=200
- PreScaleL : PS9 =1, + DVCS config.
Weekend Plan
- Note:
1/ continue production data
BPM/Spot++ Check
- After beam lost for considerable time (like beam study, pass change,...)
- Ask MCC to run 5uA wth carbon hole target and make sure you can see the hole through Spot++