Friday, March 6: OWL Shift

From Hall A Wiki
Jump to: navigation, search

Go back to Daily Run Plan Daily Run Plans

  • General considerations
    • Nickie Hirlinger Saylor is the current Run Coordinator. Please contact directly via RC phone 757-876-1787
    • Follow the generic Instructions for shift takers
    • Shift leaders: Please make sure to fill out the beam time accounting form and write a "Shift Summary" log entry at the end of your shift regardless if there is beam or not.
    • In general, Hall technical staff should not be contacted by the shift crew - please call the RC first.
    • The target operator is required to supervise the cryo-target.
    • Make sure to use the DVCS CODA configuration for all runs (even when taking single arm HRS data).


  • Instructions for this shift
    • Wait for CW beam, then call RC.
    • Prepare to do beam line run plan:
    • Beamline run plan.
      • BeO
      • Carbon Hole
      • Bullseye Scan / Harp (bpm pedestal)