Hall Access Check List

From Hall A Wiki
Jump to: navigation, search

Please fill up this check list before leaving Hall after target related work.

  • Flows
    1. Cooling Jet Flow
    2. Oven Air Flow
  • Laser Platform
    1. Laser Platform Enclosure is closed
    2. Laser Platform Enclosure is covered by Water Proof Layer
    3. Laser Tip Fan is On (you should feel the vibration from outside)
    4. No Tools left on the plateform
  • Target Chamber
    1. Target Chamber Enclosure is closed
    2. No Tools or magnetic item inside or near Vertical Coil
  • Bring out your tools and personal belongings