January 31th 2025

From Hall A Wiki
Jump to: navigation, search
  • Updates
    • HCal
      • Ran DAQ successfully with main DAQ - Everything looks ok now
      • everything looks good for thousands events - latency adjusted for cosmics
      • issue with RF missing hits in F1 even with cosmics - not clear why it happens ? High rate RF ( 6 MHz ) ?

can only put 16 hits in buffer - window 300 ns -

      • want to add an 1190
      • test stand alone HCAL config
    • GEMs
      • found issue with APV LV - connector burnt - Armen coming to fix it - now LV is fine - cable might have gotten loose - might be able to monitor with raspberry pi - IR camera - check rating of fuses - 15 A fuse now - seemed better with 10 A - two pairs should draw less than 20 A.
      • test standalone DAQ - working now with pulser - trigger cosmics working but need to adjust the latency
      • going to replace a few MPDs and will test that suspicious ones
      • INFN : worked on VTP readout in INFN cleanroom
      • Simulation : need to mmodify g4sbs to match with engineering drawing - will run simulation awork on developping the code to convert simulation to electronics map - need check with Ben for format
    • CDet
      • I made stand alone config - missing library - still need updating firmware
    • Ecal
      • testing
      • need to add VTP to stand alone config
      • 2 spare FADC to Simona - Crate 3 FADC 14 was odd
    • Scaler
      • clock frequency
      • most scalers working
    • beamline
      • helicity board tested stand alone - readout list next week