  • Updates
    • HCAL
      • setting up summing modules - have all fan in / out modules - all channels
      • Juan Carlos wrote library for DAQ
      • setup LED system to measurem attenuation : Sebastian running the DAQ
    • Bigbite Shower
      • setting up trigger monitoring system
      • working on cabling
      • V1495 DAQ for shower / preshower
      • Provokar taking data - debugging pedestal issues
      • will get FADC from NPS , Steve checking with Chris
    • Bigbite Hodoscope
      • debugging : one offset moving around on different NINO channel, might be a problem with cable - will continue taking data - BNC was checked but did not help - ADC cable to V792 replaced fixed issue ( label cable with issue and try to fix it )
      • want data combined Shower with Hodoscope ( for preshower especially ) : adding fibers to run hodoscope and shower together , will need CODA config and decoder to have both in the tree - Setting TS crate for Fastbus with Fast clear
      • readout list should still be on sbs1 or sbs2 ( was used for ECal 1881 )
    • GRINCH
      • working moving analysis script in SBS-online, almost ready to test the script
    • CDet
      • everything back up running - taking cosmics everyday and debugging / troubleshooting
    • INFN GEM
      • DAQ not back running yet, will set trigger and electronics
      • borrowing SD board from INFN clean room for TS crate
      • ordering SD with INFN money for replacement
    • UVA clean room
      • still noise issue due to grounding
      • construction work going in clean room interfering, will continue next week
    • TEDF
      • connecting GEM, almost have GEM in CODA DAQ and will take pedestal next Monday, allow to look at noise
      • Low voltage supply on network - need additionnal ports - will add dumb switch for low speed devices
    • LHRS
      • VDC running with FADC for scintillators - can analyse data
      • ATOM board for testing in HRS - still need to setup Centos 7 - will look at BigBite setup next week first
  • Data rates