Monday, March 9: DAY Shift
From Hall A Wiki
Go back to Daily Run Plan Daily Run Plans
- General considerations
- Nickie Hirlinger Saylor is the current Run Coordinator. Please contact directly via RC phone 757-876-1787
- Follow the generic Instructions for shift takers
- Shift leaders: Please make sure to fill out the beam time accounting form and write a "Shift Summary" log entry at the end of your shift regardless if there is beam or not.
- In general, Hall technical staff should not be contacted by the shift crew - please call the RC first.
- The target operator is required to supervise the cryo-target.
- Make sure to use the DVCS CODA configuration for all runs (even when taking single arm HRS data).
- Instructions for this shift
- Target cooldown is occurring.
- Shift taker be on standby until 15:00, then report to counting house.
- Hall will close after target group is done.
- Await CW beam.
- An expert will assist in continuing beam commissioning studies including:
- Harp after repairs
- BPM cross-calibration to harp study
- Carbon hole after cooldown
- "Empty" or long "raster" target after cooldown
- Beamline commissioning how-to.