Monday, March 9: DAY Shift

From Hall A Wiki
Jump to: navigation, search

Go back to Daily Run Plan Daily Run Plans

  • General considerations
    • Nickie Hirlinger Saylor is the current Run Coordinator. Please contact directly via RC phone 757-876-1787
    • Follow the generic Instructions for shift takers
    • Shift leaders: Please make sure to fill out the beam time accounting form and write a "Shift Summary" log entry at the end of your shift regardless if there is beam or not.
    • In general, Hall technical staff should not be contacted by the shift crew - please call the RC first.
    • The target operator is required to supervise the cryo-target.
    • Make sure to use the DVCS CODA configuration for all runs (even when taking single arm HRS data).


  • Instructions for this shift
    • Target cooldown is occurring.
    • Shift taker be on standby until 15:00, then report to counting house.
    • Hall will close after target group is done.
    • Await CW beam.
    • An expert will assist in continuing beam commissioning studies including:
      • Harp after repairs
      • BPM cross-calibration to harp study
      • Carbon hole after cooldown
      • "Empty" or long "raster" target after cooldown
      • Beamline commissioning how-to.