- CDet
- Last TDC ribbon cable installed, going from bottom det freame too repeater
- test new LV : all 3 supplies on hand and distribution box ready. All mmodule 36.6 A at 6.1 V
- CDet
to get 5 V at NINO - will go with the current design
- find GRINCH and hodoscope
- started looking at DAQ crate : need to use the back connector for the 15 modules
- triggers for CDet - pc
- HCal
- could take data while GEM not running - plan to move cables next week
- d90
- Beamline
- 3 or more people helping with Cip for recabling after Thanksgiving - Paul will be on site late
2nd week of December
- ECal
- network switch online - patched fiber to router for VTP
- will boot ECal crates and VTP this afternoon
- breaker tripped : Mark moved a few crates on extension coord and balanced load on phase
- cosmics firmware ready : will try with Simona with pulser when CODA is ready
- GEMs
- still moving platform
- BB VTPs are up - need to boot 4th VTP
- will get VTP setup in test lab to test histrogramming method
- CPU in test lab is not booting. CPU might be bad, also possible issue with atedf3 - will troubleshoot this afternoon - hatest1
- Bryaan will immplement MPD power trasnceiver check : willll bbMPD to him tst
- ECal