October 11th 2024
From Hall A Wiki
- Updates
- CDet
- continuing working on cabling ( Ralph at DNP )
- GEMs
- HV conditionning on front tracker
- APV issues fixed
- VTP not connecting to computer - will check cabling and configuration
- 1 crate ready, 2nd SBS crate need to be cabled
- still need to spread across all crates
- need to setup 4th VTP
- GEM lookup : still need to start - need to make sure digitization matches real layout
- CODA
- DC on adaq1 would not connect, cMsg was updated - DC was trying to 127.0.0.1 - update fixed issue
- Beamline
- try to connect to network this week
- ECal
- Andrew debugged simulation and analysis: all efficiency as function of thresholds looks fine now, will send a format for 3x5 clusters, will send note to Hanjie and Ben for the format. Binning stays same, but look up tables will change by kinematic ( several students working on that but code needed to be made more efficient ) - should take a few hours to generate all files for all the kinematic
- CDet