  • Updates
    • CDet
      • continuing working on cabling ( Ralph at DNP )
    • GEMs
      • HV conditionning on front tracker
      • APV issues fixed
      • VTP not connecting to computer - will check cabling and configuration
      • 1 crate ready, 2nd SBS crate need to be cabled
      • still need to spread across all crates
      • need to setup 4th VTP
      • GEM lookup : still need to start - need to make sure digitization matches real layout
    • CODA
      • DC on adaq1 would not connect, cMsg was updated - DC was trying to 127.0.0.1 - update fixed issue
    • Beamline
      • try to connect to network this week
    • ECal
      • Andrew debugged simulation and analysis: all efficiency as function of thresholds looks fine now, will send a format for 3x5 clusters, will send note to Hanjie and Ben for the format. Binning stays same, but look up tables will change by kinematic ( several students working on that but code needed to be made more efficient ) - should take a few hours to generate all files for all the kinematic