October 1st 2021
From Hall A Wiki
- Updates
- HCal
- ROC16 - ROC17 - seems better with fixing the busy
- taking cosmics and looking at LED - 1 LED run and 1 cosmics - most PMT calibrated - some have very long tail ( not light leak - seems linked to PMT - need to investigate and replace or move to edge of acceptance
- Bigbite Shower
- one issue with 1 preshower threshold : FADC pedestals needed to be adjusted - Ben has some software
- still running cosmics - calibration almost done
- want to set up the FADC scalers
- Hodoscope
- 3 night HV tripped randomly - last night HV did not trip, EPICS server was disabled yesterday
- need take scans with FADC
- GRINCH
- was trying to take gain matching data
- HV was tripping with LED
- stable now , pulser showing on scaler
- continuing with data collection
- TS not working right now - need TS to get LED trigger - will try to fix
- good statistics LED run - can fit most channels - need continue data taking with different HV
- CDet
- issue : 1 run with very few events recorded - total number of triggers - but no events in ADC / TDC - take data at beginning but stops - after power cycling worked fine - take screen shot of event builder and ROC and put in HALOG
- LHRS
- pretty much ready - remote power cycling fixed - latency set
- scripts start and end of run : run by hand - still working on tying with CODA
- will work with Maria to cable RF
- GEM Bigbite INFN
- taking data every night
- Sean working on FIR coefficient
- working on 4th layer of Bigbite : was working but HV issue , will be tested - aluminized mylar added
- techs working on BigBite water hose - might need to work on evening
- UVA clean room
- finished setting up HV for GEN RP
- Gas system done - gas flowing
- Thir updated all MPD firmware
- Anu working on setting up network - can set up VTP after
- host moved to hall A dev : need to PXE boot from the counting house
- GEn RP chamber : DAQ setup using Hall A system
- Helicity
- adding config file to be able to enable / disable helicity scaler
- some changes for sbsvme29 readout and will start setting up readout list
- still 120 Hz delayed - should switch to 30 Hz in time when convenient
- Beamline/scalers
- cables pulled from bunker to beamline rack : mapping / cabling posted on halog
- copy of BCM in helicity board
- plugging the helicity signals in
- David has couple of spares - that could be used for RF
- could check with Simona : she is using a beam nose patch panel for some moller signals ( 8 )
- HV : restart all GUI - will kill all previous GUI - might have cross-talk between detector
- HCal
- On going tasks
- Cable to weldment ( David / Heidi 100%? )
- cabling scaler/beamline crate ( David , Bob 100%)
- HRS to TS and timing ( Bob, Maria 50% ) - programmed high threshold for other detectors -
- software for FADC pedestals : Bryan will give to Brad
- EPICS / start End of run logging script (Alex, Bob 90%) - just need to add configuration - will make a test configuration
- script check MPD sync ( Ben , Andrew 20%) - code to unpack information already written - need run with those data - timestamp need some work
- RF (Bob ,Maria ) - located RF prescaler and signal - need to send to HRS and SBS weldment - need add F1 for RF and will send to HCAL spare F1 channels
- sync check scripts ( Andrew , Alex 0%)
- EDTM at least 1 Hz for helicity ( Scott, Arun, Mark ? ) Just need to check it is working : look for 10 Hz EDTM - need to put in TDC too - need help set up library in hodoscope crate - will plug it back and use Scott GUI
- Hodoscope v1190 clock ( Alex , Mark , Ralph) - done
- check if calibration is needed after switch - to do but should not be much - check with Ben if he as software -
- Full configration all crates ( Alex, Bryan - 52.3% ) - can attach process to components - just finish CODA config
- need setup screens for online display and analysis, Hall A tools on big screen - can make a map file - (Bryan , done )
- data rate test with new computer and 3 VTPs ( Alex, Bryan ) -
- test GEM zero supression ( Sean, Holly )- done
- FIR
- GEM cosmics ( Sean, Holly ) 70 %
- Shower cosmics (Arun, Provokar ) 90 % ?
- HCAL cosmics (Scott) - investigating the issue - most channel working - ~ 80%
- GRINCH cosmics ( Bradley ) - need 3 more runs x 8 - 4 FADC - only 64 out of 550 -
- Hodoscope cosmics ( Ralph ) - calibration TDC and nino thresholds : looks pretty good - just need to look at FADC - upper third, 2 left - 60%
- DAQ documentation ( Alex, Rachel ,Don) ( 10 % resets, need starting CODA / troubleshoooting )
- suggest taking all detectors cosmics every night - took a few runs !
- add scaler crate to full config ( Alex, Steve )
- coincidence trigger (done ) - need fine tune inputs at TS
- BB CAL and HCAL at TS - delayed after coincidence (Mark, done ) - need the RC box for FADC ref channel - need delay single triggers (Mark , done 15 ns ) - add GRINCH LED (done #5) -
- reference channel to all crates - need HCal and Shower + RF
- add FADCs for shower sum and HODO ( David / Mark /Bryan : done )
- add FADCs for GRINCH (Bryan/Alex) - done
- read threshold for discriminator from with RPi be Ellen (done) (noise issue was fixed), need give code to Steve ( done ) - could add in logentry or wiki for adding in other scripts ( check with Steve ) - Scott wanted to add those readback in GUI
- scaler gating with TS (Alex, Steve) done ? , need include code in readout list - Steve looking at adding to TS list (done)
- MPD crates on hareboot6 (done) - can be power cycled remotely
- put UVA GEM LV on reboot switch (done)
- (new) Trigger latch TS to TDC ( try F1 ? or add vetroc gem crate )
- event type decoding in analyzer - ( mention at analysing )
- MPD retiming (?) with V1495
- Issues
- transceiver issues : HCAL TI might be suspicious ROC 17 ( Scott replaced two transceiver but need to test might be bad connection )
- 1 out of 4 HRS run with TS, if reboot TS usually fixes it -
- network issue : one short fiber replaced, will try to put in protective tube
- LHRS TI : working now
- GEM with TS hanging - real MPD out of sync - fixed with new firmware - (fixed : 5.2 KHz bufferlevel 5)
- Shower FADC bad channel - FADC replaced but problem could not be reproduce - need to test more ( on going - low priority )
- HCAL FADC bad channel - repaired by Bill - jumper wiggled loose - if no pedestal - could be this jumper (fixed)
- HCAL ROC16 fiber - will double check if fiber 5 enabled - use slave5 - added additionnal fiber for ROC16 - fixed by cleaning
- warning PEB ROC - Bryan checking with Dave - might incorrect flag - not sure why - but data still in sync since only happens - still happening - not sure if it is an issue
- Shower F1 issue at high rate - need to check with OT#2 - check at sync event implemented - DMA error might come from multiple pulsing - switched to 1190 -
- Helicity scaler readout : issues working with same DMA configuration - scalers doing regular VME
- need copy of L1A for helicity scaler - can send TI output ? counting L1A between helicity event to track sync -done
- Full config still hanging on LHRS and HCAL busy : no hanging buffer level 2 - need more testing high rate
- transceiver issues : HCAL TI might be suspicious ROC 17 ( Scott replaced two transceiver but need to test might be bad connection )
- use HV EPICS : type go_hv on aslow on adaqsc , need people to check if it works and if mapping is correct
- control system studio try self update and NFS down
- EPICS server need to be started at boot, Ole and Bryan - ?
- can put documentation for other control
- (new) ROC17 F1 data - data left at sync event - seems fixed after fixing busy cabling
- (new) hodoscope no data in some events - seems fixed after putting busy from distribution board
- (new) HCAL ROC17 crash / shutdown
- (new) V1190 stuck at prestart - went away after switch to external clock - maybe bad connection
- (new) setup network port for UVA chamber testing in EEL 125
- (new) deadtime ROC17 HCAL
- (new) deadtime ROC5 hodoscope
- Hall was cleaned - fibers left and table left
- Helicity board : 2 avalaible
- F1 : need to test high rate
- could increase threshold - window width 1000 ns maybe - need to be optimized - 40 ns - no remote threshold right now - on camac - might be able to control
288 channels = 18 NIM modules