Online analysis: results and pending
From Hall A Wiki
Back to DVCS
This page is in progress, please new items to it. When you obtain a result, log in into the Halog and link it to this page. if you are willing to take charge of a given analysis, please indicate it on this page as well as the date at which you are starting to work on it.
Contents
Matching data taking with run plans
- Update the how to
- Maintain db_run.dat file: Make sure that every LHRS momentum and angle changes are logged
- Start a database of run indicating line by line the run number, the target in position, the average beam current, LHRs pnom, LHRS angle, goal
Luminosity, efficiency
Boiling test
- Establish history of the data taking against the boiling test
- Analyze data of the boiling test, conclude
Trigger efficiency
Analyze data taken on the week-end of 10-09 and 10-10 with T3 and T4 trigger
LHRS commissioning
Calibrate the ADCs:
Still to be done S1, Pion rejector,
[Cerenkov (partially done, missing cer1, 10-09)], [S2 (done 10-09)]
Calibrate detector time spectra:
Still to be done : understand timing spectra for S1,S2 and the Cerenkov
[t0 for VDC (done 10-09)]
LHRS optics run (no sieve/sieve)
Ye Zhihong is interested in this analysis)
- Establish history of the data taking against the optics run plan. Add run numbers to each step of the plan
- Define goals of analysis
- Carry on analysis (