September 27th 2024
From Hall A Wiki
- Updates
- CDet
- working in Hall on detector
- starting laying cables
- still making ribbon to VETROC and Nugent
- need to test LV supply for NINO
- turned crate on but need to check with screen - need to pull fiber to TS
- LV need internet connection : 3 cables
- cosmics paddles and trigger ? Check with Ralph
- GEM
- done with low level test for Front tracker will look at back tracker, can take cosmics with front tracker
- need to connect to TS
- top crate fibers too short
- cosmics trigger is ready
- HCAL
- still need to send trigger to TI
- ECal
- project ready to give to Ben, can implement when crate are ready
- corrected address for FADC : check that all board initialize correctly
- GEM data reduction
- send fast clear to some MPDs : but need input on MPD
- VTP data reduction : ECal and HCAL VTP sends cluster information to GEM VTPs and VTPs send only GEMs strips in region of interest
- can do it in CODA : at EB all strip information available
- Beamline / helicity
- looked in bunker, saw crate was moved - Paul will come back in November / December
- need to connect crate to network -
- patch cable moved - cables a bit long - can leave that was or use shorter cable
- CDet