  • Updates
    • CDet
      • working in Hall on detector
      • starting laying cables
      • still making ribbon to VETROC and Nugent
      • need to test LV supply for NINO
      • turned crate on but need to check with screen - need to pull fiber to TS
      • LV need internet connection : 3 cables
      • cosmics paddles and trigger ? Check with Ralph
    • GEM
      • done with low level test for Front tracker will look at back tracker, can take cosmics with front tracker
      • need to connect to TS
      • top crate fibers too short
      • cosmics trigger is ready
    • HCAL
      • still need to send trigger to TI
    • ECal
      • project ready to give to Ben, can implement when crate are ready
      • corrected address for FADC : check that all board initialize correctly
    • GEM data reduction
      • send fast clear to some MPDs : but need input on MPD
      • VTP data reduction : ECal and HCAL VTP sends cluster information to GEM VTPs and VTPs send only GEMs strips in region of interest
      • can do it in CODA : at EB all strip information available
    • Beamline / helicity
      • looked in bunker, saw crate was moved - Paul will come back in November / December
      • need to connect crate to network -
      • patch cable moved - cables a bit long - can leave that was or use shorter cable