User contributions
From Hall A Wiki
(newest | oldest) View (newer 50 | older 50) (20 | 50 | 100 | 250 | 500)
- 12:04, 15 January 2013 (diff | hist) . . (+10) . . Main Page (→12 GeV Hardware)
- 18:34, 18 April 2012 (diff | hist) . . (0) . . Solid Polarized Target (→Operational Procedures)
- 18:33, 18 April 2012 (diff | hist) . . (+30) . . Solid Polarized Target (→Operational Procedures)
- 18:27, 18 April 2012 (diff | hist) . . (0) . . Target Operator Duties (→Alarms and Safety) (current)
- 18:22, 18 April 2012 (diff | hist) . . (-138) . . Target Operator Duties (→Alarms and Safety)
- 18:21, 18 April 2012 (diff | hist) . . (-82) . . Target Operator Duties (→Check Position)
- 18:19, 18 April 2012 (diff | hist) . . (-74) . . Target Operator Duties (→Check Position)
- 18:18, 18 April 2012 (diff | hist) . . (-57) . . Target Operator Duties (→Move Target Physically)
- 18:16, 18 April 2012 (diff | hist) . . (-5) . . Target Operator Duties (→Move Target Physically)
- 18:14, 18 April 2012 (diff | hist) . . (-5) . . Target Operator Duties (→Move Target Physically)
- 18:11, 18 April 2012 (diff | hist) . . (-8) . . Target Operator Duties (→Magnet Liquid Level)
- 18:08, 18 April 2012 (diff | hist) . . (+20) . . Target Operator Duties (→Nose Level)
- 07:55, 17 April 2012 (diff | hist) . . (-2) . . Thermal Equilibrium Measurement Procedure (→Prepare Fridge:) (current)
- 07:51, 17 April 2012 (diff | hist) . . (-2) . . Thermal Equilibrium Measurement Procedure (→Take TE measurements:)
- 07:26, 17 April 2012 (diff | hist) . . (-1) . . Prepare Frig for Polarization (→Prepare Fridge:) (current)
- 00:32, 12 April 2012 (diff | hist) . . (+16) . . Running with No Helium for Optics (→Preparation:) (current)
- 00:31, 12 April 2012 (diff | hist) . . (+3) . . Running with No Helium for Optics (→Preparation:)
- 00:30, 12 April 2012 (diff | hist) . . (+49) . . Running with No Helium for Optics (→Preparation:)
- 00:02, 12 April 2012 (diff | hist) . . (+96) . . Running with No Helium for Optics (→Preparation:)
- 17:38, 9 April 2012 (diff | hist) . . (+34) . . Thermal Equilibrium Measurement Procedure (→Prepare Fridge:)
- 23:39, 28 March 2012 (diff | hist) . . (0) . . Running with No Helium for Optics
- 02:38, 28 March 2012 (diff | hist) . . (+2) . . Running with No Helium for Optics (→Preparation:)
- 02:29, 28 March 2012 (diff | hist) . . (+2) . . Solid Polarized Target (→Operational Procedures)
- 02:28, 28 March 2012 (diff | hist) . . (0) . . m Running with No Helium for Optics (Running with No Helium (Optics) moved to Running with No Helium for Optics)
- 02:28, 28 March 2012 (diff | hist) . . (+47) . . N Running with No Helium (Optics) (Running with No Helium (Optics) moved to Running with No Helium for Optics) (current)
- 02:27, 28 March 2012 (diff | hist) . . (-2) . . Solid Polarized Target (→Operational Procedures)
- 02:23, 28 March 2012 (diff | hist) . . (+2) . . Solid Polarized Target (→Operational Procedures)
- 02:20, 28 March 2012 (diff | hist) . . (+1) . . Running with No Helium for Optics
- 02:17, 28 March 2012 (diff | hist) . . (-192) . . Running with No Helium for Optics
- 01:18, 28 March 2012 (diff | hist) . . (+1,818) . . N Running with No Helium for Optics (New page: ;This procedure has not yet been edited by target coordinator. ===Assumptions:=== *NMR System is tuned *Magnet is at full field, persistent mode, leads are ramped down *Nose is over 50%, ...)
- 01:16, 28 March 2012 (diff | hist) . . (+37) . . Solid Polarized Target (→Operational Procedures)
- 06:28, 16 March 2012 (diff | hist) . . (-3) . . Thermal Equilibrium Measurement Procedure (→Take TE measurements:)
- 05:53, 16 March 2012 (diff | hist) . . (+59) . . Thermal Equilibrium Measurement Procedure (→Take TE measurements:)
- 05:36, 16 March 2012 (diff | hist) . . (-15) . . Thermal Equilibrium Measurement Procedure
- 05:15, 16 March 2012 (diff | hist) . . (+12) . . Thermal Equilibrium Measurement Procedure (→Take TE measurements:)
- 05:13, 16 March 2012 (diff | hist) . . (+5) . . Thermal Equilibrium Measurement Procedure (→Take TE measurements:)
- 03:49, 16 March 2012 (diff | hist) . . (0) . . Thermal Equilibrium Measurement Procedure
- 03:13, 16 March 2012 (diff | hist) . . (-1) . . Prepare Frig for Polarization
- 03:12, 16 March 2012 (diff | hist) . . (+38) . . Prepare Frig for Polarization
- 03:11, 16 March 2012 (diff | hist) . . (+77) . . Prepare Frig for Polarization
- 03:09, 16 March 2012 (diff | hist) . . (-1,513) . . Prepare Frig for Polarization
- 02:24, 16 March 2012 (diff | hist) . . (+3,217) . . N Prepare Frig for Polarization (New page: ;This procedure has been updated to reflect changes in the target for g2p but has not yet been edited by target coordinator. ===Software=== To aid in the TE calculation, use the "te_get...)
- 02:23, 16 March 2012 (diff | hist) . . (+35) . . Solid Polarized Target
- 02:19, 16 March 2012 (diff | hist) . . (+28) . . New Baseline Procedure (current)
- 02:08, 16 March 2012 (diff | hist) . . (+50) . . Thermal Equilibrium Measurement Procedure
- 02:04, 16 March 2012 (diff | hist) . . (0) . . Thermal Equilibrium Measurement Procedure
- 02:03, 16 March 2012 (diff | hist) . . (-216) . . Thermal Equilibrium Measurement Procedure
- 02:00, 16 March 2012 (diff | hist) . . (+457) . . Thermal Equilibrium Measurement Procedure
- 20:40, 11 March 2012 (diff | hist) . . (+2) . . Magnet Energization Procedure
- 23:32, 7 March 2012 (diff | hist) . . (+3) . . Magnet Energization Procedure
(newest | oldest) View (newer 50 | older 50) (20 | 50 | 100 | 250 | 500)