All public logs
From Hall A Wiki
Combined display of all available logs of Hall A Wiki. You can narrow down the view by selecting a log type, the username (case-sensitive), or the affected page (also case-sensitive).
- 14:14, 15 June 2018 Cameronc (Talk | contribs) uploaded File:Shower-Max-Splashback-Initial-Results.pdf (Weibin-Zhang's first slides for Shower Max splashback studies)
- 13:59, 15 June 2018 Cameronc (Talk | contribs) uploaded File:Quartz Samples 6-15-2018.pdf (Looking at sample pulses from the Moller ring 5 Mainz Prototype with Manitoba PMT.)
- 12:58, 27 September 2017 Cameronc (Talk | contribs) uploaded a new version of File:Detector Meeting-9-27-2017.pdf
- 18:56, 26 September 2017 Cameronc (Talk | contribs) uploaded File:Detector Meeting-9-27-2017.pdf
- 15:41, 7 September 2017 Cameronc (Talk | contribs) uploaded File:Simulation Meeting-9-7-2017.pdf
- 13:04, 24 May 2017 Cameronc (Talk | contribs) uploaded File:Summary spectrometer review.pdf (KK's spectrometer review summary.)
- 15:11, 23 February 2017 Cameronc (Talk | contribs) uploaded File:Radiation Study-Repeat at Radiation Meeting Update 2-23-2017.pdf (Updated talk from last week's magnet meeting about Cameron's progress and plans with the radiation simulation)
- 19:16, 14 February 2017 Cameronc (Talk | contribs) uploaded File:Radiation Study-Second Magnet Meeting Update 2-15-2017.pdf (Cameron Clarke's 2/15/2017 Magnet Meeting Update)
- 13:42, 14 September 2016 Cameronc (Talk | contribs) uploaded File:Radial parametrization.pdf (Summary of the CAD efforts to parametrize the MOLLER detector array.)
- 15:53, 7 July 2016 Cameronc (Talk | contribs) uploaded File:Moller CAD Shielding update 7-7-2016.pdf (Updated version of Moller CAD with shielding and HRS in place.)
- 13:30, 6 July 2016 Cameronc (Talk | contribs) uploaded File:Moller CAD Shielding update 7-6-2016.pdf (Cameron Clarke's slides for the Moller Magnet meeting discussing MOLLER beamline shielding.)
- 11:35, 28 June 2016 Cameronc (Talk | contribs) uploaded File:MovableCol ShieldUpdate.pdf (Preliminary look at incorporating shielding into the Moller CAD. These parameters need to be updated to match the most recent remoll dose branch update, and need to be further updated to reflect the changes induced by removing collimator 3.)