- Julie note from Beam Team Meeting at 1:30PM, Mar.8, 2016 at MCC.
- Purpose: Plans to run at 60uA
- Current issues:
- There is no consensus on why the beam is limited at 30 uA.
- Ideas:
- 1/ The limitation is in the injector - 2/ In the RF separator
- Attempt:
- 1/ Removing/Changing Wien filter (horizontal-> vertical) ?? - 2/ Run with a magnetic separation ??
- Problem foresee:
- 1/ ?? - 2/ Compatible with Hall D taking data
- GMp expert inform:
- 1/ Polarization is not matter - 2/ High current 60 uA should be deliverable for calibration and production both 4pass and 5pass
- Concluded Plan:
- Try 60 uA Thursday morning up to noon