Todo List
From Hall A Wiki
(Redirected from ToDo List as Oct 2, 2008)
Contents
Todo list as Nov 10, 2008
Before lock the laser
- EPR/NMR cross calibration (Chiranjib/Yi) 9:00 AM
In the Hall/Controlled access
- Install new target ladder (Joe) 9:30AM
- Check correction coils (Yi') 9:30AM
- Target EPICS readbacks:oven and cooling jets (Jack)
Counting House during access
- Add real vertical coil current to EPICS (Jin)
- Aborted, NMR pumping chamber frequency sweep/target chamber field sweep cross calibration (TBD)
- AFP loss test after Yi' finishes the correction coils (TBD)
Other than access
- Comet laser power on/EPICS control test (Yi)
Todo list for Controlled Access to the Hall, Nov 4, 2008
Target Enclosure
- Transverse spectrum analyzer fiber
- Hot air leak around the fiber
- Transverse laser alignment ( Lock the Hall )
- Replace damaged target ladder
Optics Bench
- Transverse laser alignment ( Lock the Hall )
- Clean optics
- Swap damaged fibers for vertical line (N7, N9) to 04 and 05 from Longitudinal line
- Check bad connector for vertical line (N6)
Pivot Area
- Aborted:Extend EPR RF amplifier cable to check EPR ( Lock the Hall )
Green Wall
- Connect Fluke45 current meters back to EPICS IOC
Todo checklist for next lock of Hall, Oct 30, 2008
- Repaire Down-stream pickup coil B
- Laser alignment
- Laser polarization
- Q-wave plate polarization
- Laser power
- EPR D2 diode
- Vertical spectrum analyzer fiber
10/26 rebuild
Yi++=Yi Qiang + ALL
- Ladder (Ed)
- Limit Switch EPICS programming (Pam)
- Heater Line (Ed/Joe/Scot)
- Enclosure (Ed)
- Ref Cell (Joe/Scot)
- Water Calib (Yi++) aborted...
- Adjust pickup coils on pumping chamber (Jin/Yi/Chiranjib)
- Test Heater / Oven (Joe/Yi)
- Mounting He3 Cell (Yi++)
- Heating Cell (Yi++)
- Laser Alignment Full Power (Yi, Chiranjib, JP)
- APF Lost Test
- Spin-down Test
- Spin Up (Yi++)
- Spin Flip Test (Jin)
- EPR Alignment (Yi++)
- Cross Calib Temp. Test (Yi++)
- Comet Laser (Yi++)
- EPICS Control (EPICS Grp)
- TO Training Preparation (Yi/Chiranjib/Jin)
Laser System
- Assemble COMET Lasers (Chiranjib/Yi)
- Move in a Rack to new target lab for COMET Lasers
- Interlock connections to Lasers (Mark/Yi)
- Interlock connections in the Hall (Mark/Yi)
- RTDs for Laser enclosure (Done by Yi'/Yi)
- RTDs to readout chassis for interlock (Yi')
- optics setup (Done by Chiranjib/Jin)
- Optics alignment (Chiranjib/Jin/Yi'/Yi/Jian-ping)
- Camera (Jin) aborted
- Spectrum analyzer (Yi)
- Q-wave plate stepping motor (Jin)
Oven and Heater
- Heater Installation (Joe)
- Heater Control Box and connection (Joe)
- Oven temperature control RTD (Yi')
- RTDs for He3 Cell and Reference Cell (Done by Yi'/Yi)
NMR System
- Longitudinal RF Coil Connection (Yi')
- Pickup Coil Cables (Chiranjib/Yi')
- VI update (Jin/Yi)
- NMR Lock-in repair (Yi)
EPR System
- EPR D2 assembly (Chiranjib/Yi)
- EPR RF Cable (Chiranjib/Yi')
Spin Flip
- Test plan (Yi/Jin)
- EPICS communication (Jin)
- Stepper Motor Commisioning (Jin)
- NMR Signal Acquisition (Yi/Jin/Chiranjib)
- 2nd Copy of Spin Signal (Jin)
- VI update (Yi/Jin)
- Finish up Documentation (Yi/Jin)
- Target Worker Quick Training Material (Yi/Jin)
EPICS & DAQ
- Target IOC (Jack/Bryan/Yi/Jin)
- Targe EPICS Variable to Data Stream (Yi/Jin)
- Analyzer code for target state (Jin)
Holding Field
- Optimal Field determination (Yi')
- Correction Field Calculation (Yi')
- Correction Coil connection (Chiranjib/Yi')
Cell Installation
- Reference Cell (Joe/Todd)
- He3 Cell (Joe)