Wednesday,Mar. 09: OWL Shift
From Hall A Wiki
Go back to Daily Run Plan Daily Run Plans
Previously...
- Production data (Kin48_2)
- Pointing run
- Golden file from production run
Specific mission
- Production run, Kin48_2
- Polarized beam at 10 uA on LH2 15 cm!
- DVCS is running kin_48_2 [here]
- LHRS is partially detuned: [here]
- LHRS=3.996GeV, Q1/Q2/Q3=1916.640(readout:1900)/1600/1600 (Q1 regul.OFF)
- PreScaleR : PS1=PS2=PS3=1, && PS8=200
- PreScaleL : PS9 =1, + DVCS config.
- beam locks: no position lock, energy lock in Arc 2: [here]
- DVCS daq configuration is [this one], we are measuring about 2% DT at 15uA.
- Pointing run for detector alignment
- 1hr run/ Optics target / same CODA configuration / 10uA - analyse this data and post plots
- Create and update a Golden file as a new reference
- 1hr run / LH2 target / same CODA configuration / 10uA - analyse this data and update the refernce - it is basically one of the best production runs.
Issue
- In this morning (6AM), we had CODA crash and not came back on due to no responding of ROC4 & 5
- Alex went to check crate during escorted access and found remote reset switch was not responding correctly (off but not on) - He needs to access hall during the beam study(2nd part of beam study) to resolve this issue (Left HRS Fastbus power remote switch)
BPM/Spot++ Check
- After beam lost for considerable time (like beam study, pass change,...)
- Ask MCC to run 5uA wth carbon hole target and make sure you can see the hole through Spot++
Please check more info on the white board in the Counting House ~!!