*********BLUEJEANS CALL-IN INSTRUCTIONS********* ---------------------------------------------------- 1. Dial Toll-Free Number: 1-888-240-2560 (U.S. & Canada) 2. International participants dial: Toll Number: 1-408-740-7256 3. Enter meeting ID:140287970 Desktop sharing: https://bluejeans.com/140287970
Contents
Agenda
Meeting room = Cebaf Center F226
General
- Hall A will start earlier than originally planned - Monday, November 25
- Hall will be locked up for high current test Wednesday or Thursday
Electron detector
- Detector installation
- detector in place pumping, 3 new 500 um silicons and plan C thick
- quote for top plate with 4 connectors 4500$
- IOC working for LV and HV ( had to replace some connectors which fell on floor )
- Issue with motion control, Ben looking at it
- FSD seems ok but need to test when magnet are on
- one missing HV distribution board
- VETROC adapter and QWAD cable adapter ordered (1500$ !)
- to do
- power detector, check noise, dark current
- cosmics
- QWAD adapter boards
- Spare QWADs
- Counting DAQ
Laser
- New LOSP in effect - everyone needs LTT, new walkthrough. No one is authorized to use system until this is done.
- Complete new laser safety training by end of month
- Mirror replacement in progress
Photon Detector
- PREX checks - complete (?)
- CREX preparations
Analysis
- ACC0 - laser-cycle analysis
- ACC4 - laser cycle analysis