Wednesday, October 19, 2016 2:00pm EST
From Hall A Wiki
Last meeting: Wednesday, September 28, 2016 2:00pm EST
Agenda
- MAG Meeting talks
- KK overview
- Juliette (4 segment torus studies)
- Rakitha (collimator power studies)
- Jim (vacuum vessel?)
- Ernie (new layout?)
- Jason (collimators)
- specify which parts of magnet system we want JLAB to cover
- cartoon
- table
- costing
- pre-CDR
- pp. 24-42 (pdf 39-57)
- lots of "historical" text sitting around
- Current organization
- overview
- kinematical considerations
- Conceptual Design
- Constraints
- Properties
- Studies of Optical Properties
- Collimation System
- Acceptance
- Beam intercepting
- Photon blocking
- Radiation shielding
- Photons at Detector
- Engineering considerations
- Engineering
- Preliminary
- Manufacturing plans
- Hybrid Toroid Services
- Cooling system
- DC Power supply
- Support Frame
- Vacuum Enclosure
- Site requirements
- Specifications (position sensitivity)
- overview
- shielding
- next meeting time
Minutes
Attending: Juliette, KK, Tyler, Jim, Jason, Chris, Ernie, Seamus
- MAG meeting - send them out by end of day Thursday
- Chris working on leads for bids
- what do we tell people on Monday
- concentrate on hybrid toroid
- power deposited on coils (Rakitha)
- Dieter is a collimator expert
- specify which parts of magnet system we want JLAB to cover
- shielding part of JLAB
- controls
- power supplies
- LCW monitoring
- collimators controls
- vacuum pumps and controls
- part of our WBS; we'll specify, JLAB design
- pre-CDR
- properties
- Fig 24, 25 should be there. not 23
- eliminate 2.3.4
- shielding
- $4 million for shielding - poly around hybrid coil
- need local shielding around the can
- next meeting time Nov. 2nd (week before the collaboration meeting)