Difference between revisions of "G2p documentation"
From Hall A Wiki
(→OSPs) |
(→OSPs) |
||
Line 6: | Line 6: | ||
*RSAD : Radiological Safety Analysis Document. | *RSAD : Radiological Safety Analysis Document. | ||
*[http://twist.phys.virginia.edu/~jdm2z/g2p/g2p_target_primer.pdf Polarized Target Primer] for shift workers (draft). | *[http://twist.phys.virginia.edu/~jdm2z/g2p/g2p_target_primer.pdf Polarized Target Primer] for shift workers (draft). | ||
− | ==OSPs== | + | ==OSPs & THAs== |
*Polarized Target. | *Polarized Target. | ||
*Septa, HKS and [http://hallaweb.jlab.org/experiment/g2p/meetings/safety_102411/Documentation/Big_Bite-1.doc BigBite] power supplies. | *Septa, HKS and [http://hallaweb.jlab.org/experiment/g2p/meetings/safety_102411/Documentation/Big_Bite-1.doc BigBite] power supplies. |
Revision as of 11:13, 20 October 2011
- COO : Conduct of Operations.
- ESAD : Experiment Safety Assessment Document.
- Brief Hazard Awareness for RadCon group and ARMS.
- Safety guidelines for Radiation Surveys.
- Guidance for Surveys in Hall A during the g2p experiment.
- RSAD : Radiological Safety Analysis Document.
- Polarized Target Primer for shift workers (draft).
OSPs & THAs
- Polarized Target.
- Septa, HKS and BigBite power supplies.
- OSP for FZ Magnets.
- TOSP for Septa field mapping.
- OSP(s) for Hall A Platforms,
- Local Dump Access Cover Sheet
- Local Dump Access
- 3rd Arm
- 3rd Arm Task Hazard Analysis
- OSP for Beamline systems.
- OSP for chicane moving mechanism.
- Pre Beam Checklist
- HKS Power Supply
- Septum Magnet
Notes
- All documents are in draft state.
- Overview of JLab's Operational Safety Procedure Program.
- JLab OSP template.
- List of previous JLab OSPs.
- The source files for all g2p documents are available here.
- The SANE experiment Documentation for reference.
- JLab Template for the COO.