Difference between revisions of "G2p documentation"

From Hall A Wiki
Jump to: navigation, search
(Documents for 2012 Production Run)
(Documents for 2012 Production Run)
Line 3: Line 3:
 
*[https://jlabsvn.jlab.org/svnroot/halla/groups/g2p/doc/g2p_Safety_Documents/COO/coo_standard.pdf COO] : Conduct of Operations (updated 01/10/2012).
 
*[https://jlabsvn.jlab.org/svnroot/halla/groups/g2p/doc/g2p_Safety_Documents/COO/coo_standard.pdf COO] : Conduct of Operations (updated 01/10/2012).
 
*[https://jlabsvn.jlab.org/svnroot/halla/groups/g2p/doc/g2p_Safety_Documents/ESAD/esad.pdf ESAD] : Experiment Safety Assessment Document (updated 01/10/2012).
 
*[https://jlabsvn.jlab.org/svnroot/halla/groups/g2p/doc/g2p_Safety_Documents/ESAD/esad.pdf ESAD] : Experiment Safety Assessment Document (updated 01/10/2012).
*[https://jlabsvn.jlab.org/svnroot/halla/groups/g2p/doc/g2p_Safety_Documents/ARMS/Hazard_Awareness.pdf Brief Hazard Awareness for RadCon group and ARMS].
+
*[https://jlabsvn.jlab.org/svnroot/halla/groups/g2p/doc/g2p_Safety_Documents/ARMS/Hazard_Awareness.pdf Brief Hazard Awareness for RadCon group and ARMS] (updated 10/18/2011).
*[https://jlabsvn.jlab.org/svnroot/halla/groups/g2p/doc/g2p_Safety_Documents/ARMS/safety_guidelines.pdf Safety guidelines for Radiation Surveys].
+
*[https://jlabsvn.jlab.org/svnroot/halla/groups/g2p/doc/g2p_Safety_Documents/ARMS/safety_guidelines.pdf Safety guidelines for Radiation Surveys] (updated 10/18/2011).
*Guidance for Surveys in Hall A during the g2p experiment.
+
 
*RSAD : Radiological Safety Analysis Document.
 
*RSAD : Radiological Safety Analysis Document.
*[http://twist.phys.virginia.edu/~jdm2z/g2p/g2p_target_primer.pdf Polarized Target Primer] for shift workers (draft).
+
*[http://twist.phys.virginia.edu/~jdm2z/g2p/g2p_target_primer.pdf Polarized Target Primer] for shift workers (updated 10/18/2011).).
  
 
==OSPs & THAs==
 
==OSPs & THAs==

Revision as of 21:33, 10 January 2012

Documents for 2012 Production Run

OSPs & THAs

Documents for December 2011 Commissioning

  • RSAD : Commissioning RSAD (Dec 2011)
  • TOSP : Commissioning TOSP (Dec 2011)

Notes