Difference between revisions of "G2p Safety Readiness Review"

From Hall A Wiki
Jump to: navigation, search
(Draft and Supporting Documents)
(Review Agenda)
Line 17: Line 17:
 
|-
 
|-
 
| 1:20 - 1:40
 
| 1:20 - 1:40
|  [http://hallaweb.jlab.org/experiment/g2p/meetings/safety_011712/talks/CKeith_DRAFT.pdf Polarized Target update (draft)] ([http://hallaweb.jlab.org/experiment/g2p/meetings/safety_011712/talks/g2p_Target_update.pdf short-note])
+
|  [http://hallaweb.jlab.org/experiment/g2p/meetings/safety_011712/talks/CKeith_DRAFT.pdf Polarized Target update] ([http://hallaweb.jlab.org/experiment/g2p/meetings/safety_011712/talks/g2p_Target_update.pdf short-note])
 
   | C. Keith
 
   | C. Keith
 
|-
 
|-
 
   | 1:40 - 2:00
 
   | 1:40 - 2:00
   | [http://hallaweb.jlab.org/experiment/g2p/meetings/safety_011712/talks/Michalski.pptx g2p/GEp Beamline] (draft)
+
   | [http://hallaweb.jlab.org/experiment/g2p/meetings/safety_011712/talks/Michalski.pptx g2p/GEp Beamline]  
 
   | T. Michalski
 
   | T. Michalski
 
|-
 
|-

Revision as of 17:16, 13 January 2012

Overview

On January 17, JLab will review the readiness of E08-027/007 to safely begin production data taking. This wikipage is the central repository of all collaboration information relevant to this review. The official charge is here. In addition, the committee has also asked us to address these specific questions.


Review Agenda

January 17, 2012; JLab F113, 1:00-5:00 pm

Time Topic Presenter
1:00 - 1:20 Introduction/Overview (draft) J. P. Chen
1:20 - 1:40 Polarized Target update (short-note) C. Keith
1:40 - 2:00 g2p/GEp Beamline T. Michalski
2:00 - 2:40 Beamline (draft) runorbits Y. Roblin
2:40 - 3:00 Break
3:00 - 3:20 Engineering, Design & Field Mapping (draft) R. Wines
3:20 - 3:40 Hall A Installation, Mechanical Structures (final) E. Folts
3:40 - 4:00 Radiation Control P. Degtiarenko
4:00 - 4:20 Radiation Damage (draft) G. Kharashvili
4:20 - 4:40 Experiment Preparation (draft) K. Slifer
4:40 - 5:00 Discussion

Finalized Documents

Title link
Procedure for Maintenance and Operation of Hall A FZ Magnets and FZ Power Supplies OSP
Safe Operation of the Big Bite Power Supply OSP
Safe Operation of the HKS Power Supply OSP
Septum Magnet Commissioning, Operation, and Troubleshooting OSP
Hall A Slow Raster OSP
Hall A Tungsten Calorimeter Operation OSP


Draft and Supporting Documents

Title link
Polarized Target OSP (draft/in review) OSP
Conduct of Operations (COO) pdf
Experimental Safety Assesment Document (ESAD) pdf
Polarized Target Primer pdf
Hazard Awareness & Safety Guidelines pdf pdf
Pre Beam Checklist docx
3rd Arm Access THA doc
3rd Arm Access doc
Local Dump coversheet doc
December Commissioning TOSP
Septa Field Mapping TOSP

Notes