Difference between revisions of "G2p Safety Readiness Review"
From Hall A Wiki
(→Review Agenda) |
(→Review Agenda) |
||
Line 41: | Line 41: | ||
|- | |- | ||
| 3:40 - 4:00 | | 3:40 - 4:00 | ||
− | | | + | | [http://hallaweb.jlab.org/experiment/g2p/meetings/safety_011712/talks/Degtiarenko.pdf Radiation Control] |
| P. Degtiarenko | | P. Degtiarenko | ||
|- | |- |
Revision as of 18:08, 16 January 2012
Overview
On January 17, JLab will review the readiness of E08-027/007 to safely begin production data taking. This wikipage is the central repository of all collaboration information relevant to this review. The official charge is here. In addition, the committee has also asked us to address these specific questions.
Review Agenda
January 17, 2012; JLab F113, 1:00-5:00 pm
Time | Topic | Presenter |
---|---|---|
1:00 - 1:20 | Introduction/Overview | J. P. Chen |
1:20 - 1:40 | Polarized Target update (short-note) | C. Keith |
1:40 - 2:00 | g2p/GEp Beamline | T. Michalski |
2:00 - 2:40 | Beamline (draft) runorbits | Y. Roblin |
2:40 - 3:00 | Break | |
3:00 - 3:20 | Engineering, Design & Field Mapping (draft) | R. Wines |
3:20 - 3:40 | Hall A Installation, Mechanical Structures | E. Folts |
3:40 - 4:00 | Radiation Control | P. Degtiarenko |
4:00 - 4:20 | Radiation Damage (draft) | G. Kharashvili |
4:20 - 4:40 | Experiment Preparation (draft) | K. Slifer |
4:40 - 5:00 | Discussion |
Finalized Documents
Title | link |
---|---|
Procedure for Maintenance and Operation of Hall A FZ Magnets and FZ Power Supplies | OSP |
Safe Operation of the Big Bite Power Supply | OSP |
Safe Operation of the HKS Power Supply | OSP |
Septum Magnet Commissioning, Operation, and Troubleshooting | OSP |
Hall A Slow Raster | OSP |
Hall A Tungsten Calorimeter Operation | OSP |
Draft and Supporting Documents
Title | link |
---|---|
Polarized Target OSP (draft/in review) | OSP |
Conduct of Operations (COO) | |
Experimental Safety Assesment Document (ESAD) | |
Polarized Target Primer | |
Hazard Awareness & Safety Guidelines | pdf pdf |
Pre Beam Checklist | docx |
3rd Arm Access THA | doc |
3rd Arm Access | doc |
Local Dump | coversheet doc |
December Commissioning | TOSP |
Septa Field Mapping | TOSP |
Notes
- Overview of JLab's Operational Safety Procedure Program.
- JLab OSP template.
- List of previous JLab OSPs.
- JLab Docushare