Overview
On January 17, JLab reviewed the readiness of E08-027/007 to safely begin production data taking. This wikipage is the central repository of all collaboration information relevant to this review. The official charge is here. In addition, the committee asked us to address these specific questions.
The review comments and the collaboration response are here (last update 2/8/2012).
Review Agenda
January 17, 2012; JLab F225, 1:00-5:00 pm
Time | Topic | Presenter |
---|---|---|
1:00 - 1:20 | Introduction/Overview | J. P. Chen |
1:20 - 1:40 | Polarized Target update (short-note) | C. Keith |
1:40 - 2:00 | g2p/GEp Beamline | T. Michalski |
2:00 - 2:20 | Beamline runorbits | Y. Roblin |
2:20 - 3:00 | Break | |
3:00 - 3:20 | Engineering, Design & Field Mapping | R. Wines |
3:20 - 3:40 | Hall A Installation, Mechanical Structures | E. Folts |
3:40 - 4:00 | Radiation Control | P. Degtiarenko |
4:00 - 4:20 | Radiation Damage (updated 1/27/2012) Dose Rates from Local Dump | G. Kharashvili |
4:20 - 4:40 | Experiment Preparation | K. Slifer |
4:40 - 5:00 | Discussion |
All Safety Documentation is here