Difference between revisions of "HV HowTo for Users"

From Hall A Wiki
Jump to: navigation, search
Line 18: Line 18:
 
To run the beamline crate:
 
To run the beamline crate:
 
./hvs BEAMLINE
 
./hvs BEAMLINE
 +
 +
http://hallaweb.jlab.org/equipment/daq/HVhelp.html
 +
 +
http://hallaweb.jlab.org/equipment/daq/gen_slow_control.html
  
 
=====================================================
 
=====================================================

Revision as of 11:34, 7 January 2014

The High Voltage is controlled by LeCroy 1458 crates and associated modules like the 1461N. A trailing "N" means negative, and a "P" means positive HV.

To control the HV in Hall A, do the following

Login as "adev" on the "adaql1" or "adaql2" computers.

cd ~adev/slowc

To run both HRS: ./hvs HRS

To run the Left HRS alone: ./hvs LEFT

To run the Right HRS alone: ./hvs RIGHT

To run the beamline crate: ./hvs BEAMLINE

http://hallaweb.jlab.org/equipment/daq/HVhelp.html

http://hallaweb.jlab.org/equipment/daq/gen_slow_control.html

=========================================

Troubleshooting

A number of things can go wrong. If these solutions don't work for you, call an expert.

1. HV crate is on ? There are two power supplies which must be turned on.

2. The GUI connects to a Perl server on a PC. The PC/server then talks to the HV crate via a serial connection. If the server isn't working for some reason, rebooting the PC may help. The name of the PC is discovered in the tab corresponding to that crate; e.g. intelha3 on Left HRS.