(Minutes)
(Minutes)
Line 34: Line 34:
 
### Just photon okay for DVCS (don't want to break anything :))
 
### Just photon okay for DVCS (don't want to break anything :))
 
### actuators for optics (after laser is running)
 
### actuators for optics (after laser is running)
 +
### with 12 GeV, green won't fit in beampipe at 12 GeV - redesign e- det can
 +
### small slot - French connection? - redesigned?
 +
### last real-world experience - power 5kW? - mirrors degrade in tunnel
 
## DAQ (Bob/Alex)
 
## DAQ (Bob/Alex)
 
### put computer back in counting house
 
### put computer back in counting house
Line 41: Line 44:
 
#### trigger supervisor, event triggered DAQ
 
#### trigger supervisor, event triggered DAQ
 
#### PREX won't use e- det - flash ADC with photon det
 
#### PREX won't use e- det - flash ADC with photon det
 
 
## photon detector (Greg/Vahe)
 
## photon detector (Greg/Vahe)
## electron detector (Juliette/Dipangkar)  
+
### analyzing power factor of 2 with green laser
 +
### with GSO photon energy is not as much of a factor
 +
### photon used for DVCS
 +
## electron detector (Juliette/Dipangkar)
 +
###
 
## magnetic field mapping (Kent)  
 
## magnetic field mapping (Kent)  
 +
###
 
## beamline status/accelerator schedule (Alex)  
 
## beamline status/accelerator schedule (Alex)  
 +
###
 
### DVCS in the fall  
 
### DVCS in the fall  
## Synchrotron light at 12 GeV running
+
### 12 GeV halo bigger
#  
+
### Synchrotron light at 12 GeV running
#
+
# consequences of restructuring
 +
# next meeting time
  
 
<br><br> Return to [[Compton]]
 
<br><br> Return to [[Compton]]

Revision as of 16:04, 27 February 2014

Previous meeting: Tuesday, December 10, 2013 11am EST - Compton

Tentative Agenda

  1. Updates
    1. laser (Kent)
    2. DAQ (Bob/Alex)
    3. photon detector (Greg/Vahe)
    4. electron detector (Juliette/Dipangkar)
    5. magnetic field mapping (Kent)
    6. beamline status/accelerator schedule (Alex)
  2. consequences of restructuring (Dave/Thia)
  3. Next meeting time


Minutes

Attending: Juliette, Dustin, Dave, Alex, Brian, Greg, Kent

  1. Updates - Near term and long term goals, mostly near term (DVCS, PREX/CREX)
    1. laser (Kent -> Dave)
      1. near term - getting running again (how it was set up before)
      2. few kW green power (easier then IR)
      3. green good for PREX
      4. work in hall (not in laser lab - 2nd floor ARC)
      5. Chuck Long (spectrometer group - Jack Segal running)
      6. single-pass frequency doubling only problem (expertise at the lab)
        1. still trying to locate parts - crystal (several purchased)
        2. thermoelectric chillers to control temp
        3. stage still on table
        4. Abdurahim - thesis - photos, etc.
      7. trying to organize after restructuring
      8. Just photon okay for DVCS (don't want to break anything :))
      9. actuators for optics (after laser is running)
      10. with 12 GeV, green won't fit in beampipe at 12 GeV - redesign e- det can
      11. small slot - French connection? - redesigned?
      12. last real-world experience - power 5kW? - mirrors degrade in tunnel
    2. DAQ (Bob/Alex)
      1. put computer back in counting house
      2. trying to run the flash ADC DAQ on it
      3. High flip rate capability of the DAQ (MOLLER)
        1. old DAQ - ran at 30 Hz
        2. trigger supervisor, event triggered DAQ
        3. PREX won't use e- det - flash ADC with photon det
    3. photon detector (Greg/Vahe)
      1. analyzing power factor of 2 with green laser
      2. with GSO photon energy is not as much of a factor
      3. photon used for DVCS
    4. electron detector (Juliette/Dipangkar)
    5. magnetic field mapping (Kent)
    6. beamline status/accelerator schedule (Alex)
      1. DVCS in the fall
      2. 12 GeV halo bigger
      3. Synchrotron light at 12 GeV running
  2. consequences of restructuring
  3. next meeting time