Line 75: | Line 75: | ||
### student here to start with borrowed setup, building lab | ### student here to start with borrowed setup, building lab | ||
## magnetic field mapping (Kent) | ## magnetic field mapping (Kent) | ||
+ | ### quantitative disagreement with TOSCA | ||
+ | ### inside the dipole, 30-40 cm 10^-3 differences | ||
+ | ### nobody ever mapped it - Alex may have it? | ||
+ | ### Bdl was measured... | ||
## beamline status/accelerator schedule (Alex) | ## beamline status/accelerator schedule (Alex) | ||
### upcoming beam test in March | ### upcoming beam test in March | ||
Line 85: | Line 89: | ||
## plan to make the systems more similar | ## plan to make the systems more similar | ||
### DAQ more like Hall A | ### DAQ more like Hall A | ||
− | ### laser more like Hall A | + | ### laser more like Hall A (fiber amp., narrow line width IR) |
− | ### | + | ## manpower - same amount of work done by less people |
+ | ### user support will be very valuable | ||
+ | ### photon detector under control | ||
+ | ### electron detector has challenges, but people are working on it | ||
# next meeting time | # next meeting time | ||
+ | ## keep meeting with a large group | ||
+ | ## once a month for now, more frequent in summer | ||
+ | ## beginning of April - Doodle poll last week of March | ||
<br><br> Return to [[Compton]] | <br><br> Return to [[Compton]] |
Latest revision as of 16:53, 27 February 2014
Previous meeting: Tuesday, December 10, 2013 11am EST - Compton
Tentative Agenda
- Updates
- laser (Kent)
- DAQ (Bob/Alex)
- photon detector (Greg/Vahe)
- electron detector (Juliette/Dipangkar)
- magnetic field mapping (Kent)
- beamline status/accelerator schedule (Alex)
- consequences of restructuring (Dave/Thia)
- Next meeting time
Minutes
Attending: Juliette, Dustin, Dave, Alex, Brian, Greg, Kent
- Updates - Near term and long term goals, mostly near term (DVCS, PREX/CREX)
- laser (Kent/Dave)
- near term - getting running again (how it was set up before)
- few kW green power (easier then IR)
- green good for PREX
- work in hall (not in laser lab - 2nd floor ARC)
- Chuck Long (spectrometer group - Jack Segal running)
- single-pass frequency doubling only problem (expertise at the lab)
- still trying to locate parts - crystal (several purchased)
- thermoelectric chillers to control temp
- stage still on table
- Abdurahim - thesis - photos, etc.
- trying to organize after restructuring
- Just photon okay for DVCS (don't want to break anything :))
- actuators for optics (after laser is running)
- with 12 GeV, green won't fit in beampipe at 12 GeV - redesign e- det can
- small slot - French connection? - redesigned?
- last real-world experience - power 5kW? - mirrors degrade in tunnel
- DAQ (Bob/Alex)
- put computer back in counting house
- trying to run the flash ADC DAQ on it
- High flip rate capability of the DAQ (MOLLER)
- old DAQ - ran at 30 Hz
- trigger supervisor, event triggered DAQ
- PREX won't use e- det - flash ADC with photon det
- photon detector (Greg/Brian)
- existing GSO brought back to CMU
- modified so it will fit
- more adjustability - need some safety stops on xy table
- eventual plan - two detectors one for higher energy
- analyzing power factor of 2 with green laser
- with GSO photon energy is not as much of a factor
- photon used for DVCS
- looking at PbW for 12 GeV
- no timeline
- Sirish had a source for large crystal - Shanghai?
- 2cm square are common - wrap them together... if no choice
- 3% would be pretty useful for DVCS
- Hall C four crystals will fit (but not the box they're in)
- cooling PbW
- light output fluctuates near room temp.
- more light with cooler - 15 C?
- need to calibrate with spectrum in counting, and would be distorted
- if energy changes, then effects from that, too
- radiation level too high for lead glass? (1 MHz photon rate)
- better for lead flouride (3x3cmsq, 18.6 cm long?)
- for near term - 4 crystal lead tunsgate in DVCS with and without cooling
- existing GSO brought back to CMU
- electron detector (Juliette/Alex)
- MOU completed
- Alex preparing contract to loan
- single plane w/half not functional
- French A/D
- QWAD
- plan to try to get a postdoc for Compton/PREX
- student here to start with borrowed setup, building lab
- magnetic field mapping (Kent)
- quantitative disagreement with TOSCA
- inside the dipole, 30-40 cm 10^-3 differences
- nobody ever mapped it - Alex may have it?
- Bdl was measured...
- beamline status/accelerator schedule (Alex)
- upcoming beam test in March
- DVCS in the fall
- 12 GeV halo bigger
- Synchrotron light at 12 GeV running
- laser (Kent/Dave)
- consequences of restructuring
- Halls A/C merged
- Dave is tasked with Hall A Compton
- plan to make the systems more similar
- DAQ more like Hall A
- laser more like Hall A (fiber amp., narrow line width IR)
- manpower - same amount of work done by less people
- user support will be very valuable
- photon detector under control
- electron detector has challenges, but people are working on it
- next meeting time
- keep meeting with a large group
- once a month for now, more frequent in summer
- beginning of April - Doodle poll last week of March
Return to Compton