Difference between revisions of "Commissioning Run Plan"
From Hall A Wiki
(→Commissioning/ Calibration) |
|||
Line 5: | Line 5: | ||
</ul> | </ul> | ||
− | == Commissioning | + | == Commissioning and Calibrations == |
Revision as of 15:39, 6 October 2014
For the Fall of 2014 assume:
- max 20 uA but for short times it can go higher for boiling studies and BCM calibration.
- 7.3 GeV @ 4 pass, 5.5GeV @ 3 Pass and 3.7 GeV @ 2 pass. No five pass beam in the Fall of 2014.